Sequences
Keep a path of an A/B test
Ends the A/B test by hand: every new lead gets the path from now on, and once nobody is left on another path the sequence keeps only its steps. Keeping the path already kept changes nothing; keeping another one once the test is decided answers 409.
Authorizations
Bearer authentication header of the form Bearer <token>, where <token> is your auth token.
Path Parameters
Body
application/jsonResponse
Success
Version number; each save adds one.
The steps, in the order they run.
Per step id: leads that reached the step (reached) and those who accepted, replied or booked a meeting at it (converted).
Template problems that did not stop the save, such as a custom field no upload to the campaign has; empty when there are none.
Every A/B test in the steps, then the finished ones the steps no longer hold.
The rates and pace A/B test plans are made from.
When the version was saved (ISO 8601).